Back to projects
Oostkamp E40-E403 klaverblad
Under construction:
2
onshore wind turbines
4.7
MW
total installed capacity
2,400
families / year
4,100
tons
of carbon emissions avoided / year
Related news
All news items-
News
Update status of yards 2024
With the realisation of seven onshore wind turbines, spread over four locations in Belgium, the Aspiravi Group is again making a major contribution to the various climate and renewable energy goals this year. The state of play on the sites at Oostkamp, Diest, Bilzen and Evergem can be followed here.
Published on
-
News
Aspiravi to build 7 onshore wind turbines at 4 sites in Belgium in 2024
This year, the Aspiravi Group is once again making a major contribution to various climate and renewable energy targets. On the schedule is the realisation of 7 onshore wind turbines spread over 4 locations in Belgium.
Published on