Skip to content
Back to projects

Bassenge E313

Aspiravi nv has applied for a permit for a new project consisting of two wind turbines alongside the E313 motorway in the municipality of Bassenge.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
8 MW
total installed capacity
families / year
5,714
families / year
of carbon emissions avoided / year
9,140 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case