Skip to content
Back to projects

Antwerpen Rechteroever 2017

In 2017, the Aspiravi Group built eighteen wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
18
onshore wind turbines
total installed capacity
54 MW
total installed capacity
families / year
36,500
families / year
of carbon emissions avoided / year
61,800 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case