In 2021, the Aspiravi Group built six wind turbines on the left bank of the Port of Antwerp.

In operation:
onshore wind turbines
6
onshore wind turbines
total installed capacity
22 MW
total installed capacity
families / year
15,700
families / year
of carbon emissions avoided / year
25,200 tons
of carbon emissions avoided / year