Skip to content

Neufchateau E411 – E25

A project comprising two wind turbines located within the municipality of Neufchâteau, along the E25, to the south of Eneco’s operational wind farm. A project comprising two wind turbines located within the municipality of Neufchâteau, along the E25, to the south of Eneco’s operational wind farm.

In initiation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
14 MW
total installed capacity
families / year
8,500
families / year
of carbon emissions avoided / year
14,370 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case