Skip to content
Back to projects

Antwerpen Rechteroever 2014

In 2014, the Aspiravi Group built five wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
5
onshore wind turbines
total installed capacity
11.8 MW
total installed capacity
families / year
10,000
families / year
of carbon emissions avoided / year
16,000 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case