PIXIN
- 2026
- Under construction
Energy storage project BESS PIXIN is a LFP lithium-ion battery stand-alone energy storage system, designed to provide flexibility to the electricity system and support the integration of renewable energy in the grid. The project is located in Corvera de Asturias.
Last update: June 30, 2026
Updates
Installed power : 5,5 MW
Storage capacity : 22,6 MW h (> 4 hours)
Technology : LFP (Lithium Iron Phosphate) batteries
Configuration : Stand-Alone system
Advanced capability : Grid forming system with Blackstart
Efficient integration of renewable energy
Improved grid stability
Provision of flexibility services
Use of innovative technology for the grids of the future
This project has been awarded funding under the first call for innovative energy storage projects, managed by IDAE (Instituto de Diversificación y Ahorro Energético) and co-financed by the European Regional Development Fund (ERDF). 2021 – 2027
Project Reference number : FEDERPINALM-2025-001000
Grant awarded : € 1,97 M
After obtaining all the required permits- Grid Access, Environmental, Administrative Authorizations, Building License, Land easement for the transmission line- the project has started the construction in June 2026.