Skip to content
Back to projects

Hoogstraten E19 Transportzone

Aspiravi nv has applied for an environmental permit for a new project consisting of two wind turbines alongside the E19 motorway in the municipality of Hoogstraten.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
8.4 MW
total installed capacity
families / year
8,000
families / year
of carbon emissions avoided / year
12,796 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case