Skip to content
Back to projects

Hannut E40

Aspiravi nv has applied for a permit for a new project consisting of two wind turbines alongside the E40 motorway in the municipality of Hannut.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
7.2 MW
total installed capacity
families / year
5,362
families / year
of carbon emissions avoided / year
8,577 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case