Ham Albertkanaal II

The Limburg win(d)t nv Ham Albertkanaal II wind farm is situated alongside the Albertkanaal in the municipality of Ham and consists of two wind turbines that have been generating green electricity since 2016.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
4.1 MW
total installed capacity
families / year
2,300
families / year
of carbon emissions avoided / year
3,800 tons
of carbon emissions avoided / year