Skip to content
Back to projects

Diest E314

The Aspiravi nv Diest E314 wind farm is situated alongside the E314 motorway in the municipality of Diest and consists of one wind turbine that has been generating green electricity since 2018.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
3.4 MW
total installed capacity
families / year
2,200
families / year
of carbon emissions avoided / year
3,700 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case