Skip to content
Back to projects

Berlare E17

Aspiravi and Engie have submitted an environmental permit application for the construction and operation of 3 wind turbines along the E17 in Berlare territory.

In procedure:
onshore wind turbines
3
onshore wind turbines
total installed capacity
21.6 MW
total installed capacity
families / year
12,000
families / year
of carbon emissions avoided / year
16,000 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case